Skip to content
1000eng1000eng
Services

Four ways to get nuclear-ready

Every service applies the same method, the 1000eng cycle, adapted to your product and your organisation.

The 1000eng cycle

The same method whatever the standard: ISO 19443, RCC-M, ASME III, IAEA requirements. The standard sets the criteria; the method governs how analysis, implementation and verification are carried out.

  1. FRAMERegulatory context and positioning: which certifications to obtain and which standards to cover through internal capability
  2. ASSESSEvidence-based gap analysis: requirement-by-requirement Compliance Matrix, Evidence Register, process-owner interviews
  3. PLANRoadmap with milestones, responsibilities and deliverables, sized on the actual gaps
  4. IMPLEMENTDocuments and processes. The system stays yours: we draft, co-draft or review, transferring know-how to your team
  5. VERIFYInternal audit, residual gaps and corrective actions
  6. CERTIFYSupport in selecting the certification body and through Stage 1 and Stage 2 audits, or through customer qualification audits

Let's discuss your case